AAuditPro Suite· Complete manual
Complete manual Workpapers (summary)

The 12 standard workpapers

CodeAreaProceduresPrimary ISA
A-100Planning3ISA 300/315/320
B-100Cash & Bank5ISA 505
C-100Receivables7ISA 505/540
D-100Inventory8ISA 501
E-100PPE9IAS 16
F-100Payables5ISA 505
G-100Revenue8IFRS 15
H-100OpEx5ISA 330
I-100Equity4CCL Art. 132
J-100Tax6RD 121/2020
K-100Going Concern5ISA 570
L-100Subsequent Events4ISA 560

Total: 79 procedures. Auto-seeded in < 2 seconds when job is created from TPL-AA.

The 6 tabs per workpaper

  1. Overview

    Header bar with code · title · status · materiality · primary ISA · 5-stage sign-off ribbon. Conclusion section.

  2. Lead schedule

    GL rows pulled from job_trial_balance_rows with PY/CY/AJE/final/variance%/materiality flag. Refresh-from-TB button.

  3. Procedures

    Per-step checklist with isa_reference + assertion_tested + sample method + result + findings + evidence attachments.

  4. Samples

    Per-item test detail (e.g. 30 receivable confirmations).

  5. Cross-refs

    Polymorphic links to other workpapers · AJEs · FS notes · review points · attached files.

  6. Sign-offs

    5-stage chain: Preparer → Reviewer → Manager → Partner → EQCR. Each stage unlocks only when prior is signed. Locks after EQCR.

The audit-flow chapters

For full coverage of every phase, see the audit-flow manual:

PhaseManual chapter
Pre-flight overview · 8 key terms
Engagement setup (M03/M04/M07)
A-100 Planning + materiality
Trial Balance import
Auto-seed 12 workpapers
Walk each workpaper
AJEs + Adjusted TB
FS line mapping
Generate SFP/SPL/SCF/SOCIE
24 FS notes
Disclosure compliance
5-stage sign-off chain
Audit completion gate
Draft Auditor's Report
Sign + Lock + 7-year archive

Disclosure compliance

120+ items auto-seeded per audit job. Each tracked as Pending / Yes / N/A / Outstanding. Cross-linked to FS notes + workpapers. Mandatory items must close before audit completion. → Disclosure chapter

Audit completion gate

The partner's readiness verdict screen. 8 gates:

  1. All 12 workpapers signed through partner
  2. 5/5 sign-off matrix on every required workpaper
  3. All AJEs have a final disposition
  4. Σ passed_unrecorded AJEs < overall materiality
  5. 0 outstanding mandatory disclosures
  6. All material FS notes finalised
  7. 0 open review points
  8. Adjusted TB balances

Single hero banner: green "Ready to sign" or red "Not yet ready — N blockers" with explicit list. → Completion chapter

For depth

This summary lists what's possible. The dedicated Audit-flow manual walks each phase end-to-end with regulatory citations, screen mock-ups, worked examples, and field-by-field guidance.